FEDERAL MINISTRY OF POWER, WORKS & HOUSING

FMPWH

Font Size
Welcome To Federal Ministry Of Power Works And Housing
Rehabilitation Reconstruction And Expansion Of Lagos Ibadan Expressway
The Works Sector
The Housing Sector
Inspection Tour Of The Production Facility For Polysterene Technology And Other Building Material Components
The Power Sector
Inspection Tour Of Kashimbila 40Mw Hydro Power Plant In Taraba
Power Works And Housing

LATEST PRESS
August 23, 2019

There’s A Lot Of Work Ahead Of Us, In Spite Of What We’ve Done Before, Says Fashola

* As he assumes duty as Minister of Works and Housing
* Calls for readiness among staff of the Ministry to work towards achieving Presidential mandate of economic prosperity for all
* Expresses joy that staff have continued some of the projects left behind at the expiration of last administration
* Suspends all travels, leave of absence to ensure the working out of the budget for the Ministry in the next two weeks

The new Minister of Works and Housing, Mr. Babatunde Fashola SAN, has called for readiness among the staff of the Ministry in order to achieve the mandate of the Federal Government for economic growth and development as well as job creation in the country expressing his resolve to provide the needed leadership.

Fashola who was the immediate past Minister of Power, Works and Housing, said the need to achieve the mandate was in line with the clear mandate of President Muhammadu Buhari who in his speech, while swearing in the Ministers earlier, had made it clear that he wanted the Ministers to further grow and stabilize the nation’s economy.

Addressing the senior management staff of the Ministry at the Conference Room in Mabushi soon after the inauguration at the State House, Fashola expressed joy that the staff had remained faithful to some of the works left behind by his team during the last administration but warned that that there was still work to be done to consolidate on the foundation so far laid.

The Minister declared, “I am happy to see that some of the works we left you have remained faithful and that is in the spirit of continuity and development which is what the nation needs”. He added, however, “There is still a lot of work ahead of us in spite of what we have done before and I offer myself ready and willing to do my part by providing leadership and I trust that all of you are ready as well”.

“The mandate of Mr. President is very clear and it derives from his mandate to the people of Nigeria. And if you watched the Swearing-in ceremony today and listened to his speech, he wants us to be his eyes and ears and his agents to serve all the people of Nigeria and that is what we must set out to achieve”, Fashola said pointing out that the President was unequivocal on the urgent need to stabilize the economy.

According to the Minister, the President was clear about the need to sustain the growth already experienced in the economy, adding, “The economy has grown from recession and out of recession and it has grown for consecutive eight quarters. But we need to double that growth and even multiply it , but that will depend on how we work this time. The central purpose is to create prosperity and to create jobs and I think this is possible”.

Fashola, who said the immediate need was to work out a budget for the Ministry in the next two weeks, urged all the agencies and departments of the Ministry to work closely with the Permanent Secretary to achieve the feat adding that the budget remained the article of faith between the government and the governed.

He declared, “One of the first things we have to do is to quickly work out the budget for the Ministry of Works and Housing and we have to do that in the next two weeks”, adding that because the budget was the article of faith in governance, all agencies and departments of the Ministry must work together to produce a budget worthy of note by the Ministry.

Pointing out that the leadership of the National Assembly has expressed commitment to conduct all the budget defenses in the month of October, Fashola said in order to ensure that this was achieved and all documents were made ready for the defense, all leaves, travels and other less compelling engagements must be put aside for now.

He stressed the need for the nation’s professionals to be more committed and dedicated to the service of the country pointing out that the fortunes of every nation was determined by how their professionals engage in national service. He said the central purpose of public service was to create prosperity and deliver better life to the people.

Welcoming the new Minister of State, Engineer Aliyu Abubakar, Fashola, who expressed joy that he is reuniting with the new Minister , “in the service of our fatherland” after many years, disclosed that aside working with him at the level of Governors' Forum they also worked together in the formative years of the All Progressives Congress.

Describing him as a very strong Party Man, Fashola, who said the speech rendered by the Minister of State was the longest he ever heard him give, added, “What is instructive about it is that he has laid himself bare to those of you who don`t know him. This was plain in all he has said.”

The Minister said in terms of professional qualifications, the new Minister of State was bringing a lot of experience that would be beneficial to the Ministry, adding, “I heard a very rousing applause when he said he is a civil engineer and also when he included his water engineering background. And so, of course, he brings a lot of experience that is beneficial to the Ministry.”

The inaugural meeting with management staff of the Ministry was attended by the Permanent Secretary Works, Directors, heads of departments and agencies of the Ministry as well as Special Advisers and other top government functionaries.

Perm Sec Works And Housing Urge Civil Servants To Be More Productive And Goal Oriented The Permanent Secretary of Federal Ministry of Power, Works and Housing, Alhaji Mohammed Bukar, urged staff of the Ministry to be goal oriented and more productive with their time. This was at the Productivity Lecture series organized by the National Productivity Centre (NPC) in conjunction with the office of the Head of Civil Service of the Federation, for middle level officers in Abuja. The Perm Sec who was represented by the Deputy Director (HRM) Mrs. Aderonke Jaiyesimi, said in furtherance to transforming the Public Service, the Head of Civil Service of the Federation had fashioned out initiatives such as efficient, productivity, incorruptible and citizen-centred transformation programme. The concept of Productivity according to her was crucial to the success of the Public Service and an epicentre in the current reforms programme of the present Administration; It is a level of efficiency in combing inputs to achieve maximum output by employees in the work places. She therefore urged the participants to embrace knowledge through interacting with the resource persons to make the desired impact on their jobs which would be beneficial to the Ministry in the long run. Speaking at the Lecture, Director, Current Affairs and Information, National Productivity Centre, Mal. Hassan Abdullahi buttressed the fact that productivity was an attitude of the mind and therefore required “doing the right thing and doing things right”. The key words were efficiency, effectiveness, quality, competitiveness and motivation. He further recommended the adoption of the Japanese 5s Housekeeping Practice tools - Sort, Straighten, Shine, Standardize and Sustain to improve productivity in the work place.  He added that the staff productivity level could increase through managing their time, working smarter, improving the efficiency level, getting organized, encouraging teamwork as well as setting SMART targets. Papers presented at the Lecture were Overview of Productivity and Time Management for improved productivity and the objective of the programme was to stimulate the awareness of staff to the imperative of sharpening their competencies for improved productivity and efficient service delivery.
July 18, 2019
Please Complete The Good Works We’ve Started - Fasola Charges Staff The Minister of Power, Works and Housing, Babatunde Raji Fashola, SAN, has urged the management and staff of his Ministry to try as much as possible and complete the outstanding works he did not finish from 11th of November he resumed office till his exit on 28th May 2019. He also enjoined them not to undermine President Mohammadu Buhari’s quest to deliver quality service to Nigerians in his next level to improve and move the economy forward. Fashola gave the charge today in his Ministry’s Headquarters, Abuja during the valedictory Meeting the Management Staff held in his honour and that of the Minister of State for Power, Works and Housing, Honourable Mustapha Baba Shehuri. Fasola and Shehuri respectively commended the Permanent Secretary (Works and Housing Sector), Alhaji Mohammed Bukar, his counterpart, (Power Sector), Engr. Louis Edozien, the Management and Staff of the Ministry for the co-operation and support given to them during their tenure as Ministers. While appealing for forgiveness from Staff whose toes were stepped on in the course of carrying out their duties, the Ministers appealed for extension of support and co-operation to anyone that might be appointed as the next Minister, stressing that government is a continuum. The various Directors and Heads of Agencies in the Ministry who delivered goodwill messages saluted Fashola and Shehuri for their team spirit, doggedness, resourcefulness and innovativeness in carrying out the mandate of the Ministry. Earlier, the Permanent Secretary Federal Ministry of Power, Works and Housing (Works and Housing), Alhaji Mohammed Bukar extoled both Fashola and Shehuri for superintending and piloting the affairs of the Ministry in the most efficient manner which ushered in an increase and unprecedented increase in the budgetary allocation of the Ministry. In his closing remark, Engr. Louis Edozien stated that the two Ministers had left legacies and indelible marks on the Ministry of Power, Works and Housing so difficult and challenging to surpass in the near future. He prayed that the Almighty God will continue to guide and strengthen them in their future endeavours.
May 28, 2019
FG Denies Plans To Stop Payment Of Shortfalls To GENCOS Following a report in a national daily newspaper, the Ministry of Power, Works and Housing Wednesday denied that the Federal Government has stopped the payment of shortfalls to Electricity Generation Companies (GenCos), describing the report as both false and unfounded. The report, contained in the Wednesday edition of Punch Online media, held that the Federal Government on Tuesday ordered power generation companies to find customers and sell their power directly to the identified customers as, according to the report, “plans are on the way for it to ultimately exit the monthly payments to Gencos to help cushion the revenue shortfalls on the books of the power generators as a result of the poor remittances from the power distributors”. The report titled, “FG to stop payment of shortfalls to Gencos” and attributed to the Permanent Secretary (Power) in the Ministry, Engr. Louis Edozien, emanated from the remarks of the Permanent Secretary at a Workshop organized by the Nigerian Electricity Regulatory Commission (NERC) on Tuesday, 12th February, 2019 on the Eligible Customer Regulation. But in a Statement signed by the Permanent Secretary in person, the Ministry asserted that at no point in his remarks did the Permanent Secretary state that "FGN is to stop payment of shortfalls to Gencos", pointing out that the Payment Assurance Programme of the Federal Government that authorized the Nigerian Bulk Electricity Trader (NBET) to guarantee payment for any power it has contracted from generation companies on the national grid had not been reversed. The Statement read in part, “The Payment Assurance Programme of the Federal Government of Nigeria that authorized NBET to borrow N701.9 billion to guarantee payment for any power it has contracted from generation companies on the national grid and their gas and other suppliers has been in operation since January 2017. The amount NBET is authorized to borrow is not yet fully drawn. The Federal Executive Council (FEC) approved the programme. FEC has not taken any decision to stop it. FEC is the appropriate authority to comment on the Programme’s tenure and borrowing ceiling”. In order to set the records straight, the Statement clarified that at the workshop organized by NERC on the Eligible Customer Regulation, the Permanent Secretary urged generation companies to more aggressively take advantage of the regulation to sell the power they can generate, of which 2,000MW is now stranded, to Eligible Customers who need it and are willing and able to pay for it. Insisting that it would be better than waiting for NBET to pay for it or to guarantee it, for which NBET needs support from the Federal Government due to shortfalls in payment by distribution companies, the Permanent Secretary decried that though the Minister issued the policy direction to NERC that gave rise to the regulation in May 2017, and NERC has issued the regulation, none of the interested consumers and their generation company suppliers have been given licenses to buy and sell power as Eligible Customers. He encouraged NERC to accelerate and simplify the licensing process. He further stated that the Transmission Company of Nigeria (TCN) should continue to support the regulation by making targeted investments in the national grid, as needed to service specific contracts with generation companies and Eligible Customers to transmit the power, with penalties for failure to transmit, adding that TCN could finance such targeted investments with the expected revenue from such bilateral transmission contracts. Encouraging electricity distribution companies (DisCos) to embrace the policy, the Permanent Secretary argued that if the DisCos were satisfying the power supply needs of their consumers of bulk power adequately such consumers would have no reason to generate the power by themselves or to want to become Eligible Customers adding that by embracing the regulation, the DisCos could partner with investors and generation companies to build new distribution infrastructure to better serve specific paying customers. “They can buy power directly from generation companies and contract with TCN to deliver it, and give premium service to selected customers or customer groups”, the Permanent Secretary said adding that in such cases the distribution company must be willing and able to guarantee the payment for the power they buy, “because the shortfalls in payment which characterizes their power purchases from NBET, would not be possible in such bilateral contracts”. The Permanent Secretary then enjoined dissatisfied consumers to take advantage of the Customer Care platforms set up by all the distribution companies in compliance with the provisions of their license, and escalate unresolved complaints to the NERC Consumer f Forum offices, as provided for in regulations, emphasizing that dissatisfied consumers could take advantage of the Mini-Grid Regulation, NERC's up-coming Franchising Regulation and the Eligible Customer Regulation to get premium power that meets their needs. The Workshop revealed that the Ministry has received forty four (44) expressions of interest with a total demand for 600MW from underserved and unserved consumers desirous of becoming Eligible Customers. Of these, 14 have submitted license applications to NERC, two have fulfilled all NERC's conditions and expect to be licensed imminently. The Ministry enjoins the public to discountenance the false report, and requests that the news outlets purveying such fake news cease and desist.
February 20, 2019
Records 4 to 6 of 169
PUBLIC ANNOUNCEMENT
August 22, 2019

FEDERAL MINISTRY OF POWER, WORKS & HOUSING
(WORKS & HOUSING SECTOR)
HEADQUARTERS, MABUSHI, ABUJA

INVITATION FOR PRE-QUALIFICATION/EXPRESSION OF INTEREST (EoI) FOR WORKS , GOODS  AND CONSULTANCY SERVICES
1.0    INTRODUCTION

The Federal Ministry of Power, Works and Housing (Works & Housing Sector) intends to execute some capital projects as provided for in the 2019 Appropriation Act, in compliance with the provisions of the Public Procurement Act, 2007. The Ministry, therefore, invites interested and competent Contractors, Suppliers and Consultants to submit Technical and Expression of Interest (EoI) documents for the execution of Year 2019 Projects:

2.0    SCOPE OF WORKS/ASSIGNMENTS
Details of the Scope of Works/Assignments are contained in the Bid Documents. The projects were grouped/categorized into A to F, respectively. Bidders are therefore, requested to submit their respective Technical/EoI documents for the categories chosen on the basis of the specific requirements for each project as categorized and specified in Sections 4.0 of this publication.The projects are listed in the table below:

LOT PROJECT TITLE
  CATEGORY ‘A’: ROADS & BRIDGES
A.1 Dualisation of Akure to Ado Ekiti Road in Ondo /Ekiti States
A.2 Construction of Ukana –AkpaUtong-Ikot Ntuen Road Akwa Ibom State
A.3 Rehabilitation of Achingali- Udoobiz-Udo-Na-Umumwana-Ubakala Road including Bridge Across Imo River in Imo State
A.4 Rehabilitation of Sokoto-Illela (Nigeria)-Birnin Konni (Niger Republic) Road in Sokoto State 
A.5 Construction of Iluke – AiyetoroKiri – Abugi – Eggan Road, Kogi State
A.6 Construction of Bama – Gulumba – Rann Road
  CATEGORY ‘B’: ROADS & BRIDGES
B.1 Rehabilitation of Odo –OnaElewe Idiayunre- Mamu Ogun State Border in Oyo State
B.2 Construction of Tamawa-Gulu Road in Kano State Phase 3: Maigari – Gulu Section
  CATEGORY ‘C’: OTHER ROAD & BRIDGES
C.1 Construction/Rehabilitation of Roads and Bridges in the Six (6) Geo-Political Zones
  CATEGORY ‘D’:
D.1 Rehabilitation /Restoration of Federal Government Secretariat and other Federal Government Buildings in selected States/FCT
D.2 Construction/Completion of Additional Facilities, Supply and Installation of Workshop Equipment in Training Schools and Workshops Nationwide
D.3 Fencing of Federal Government Lands  and other Properties in Selected States
D.4 Urban Renewal and Slum Upgrading Project: Provision of Motorized/Solar Powered Boreholes in Selected States
D.5 Urban Renewal and Slum Upgrading Project: Construction and Rehabilitation of Roads, Culverts and External Drainage Works in selected States/FCT
D.6 Provision of Infrastructure (Roads & Drains, Water and Electricity Supply) in the New Town in FCT
D.7 Construction of Roads, Drainages, Culverts and Erosion Control, Class Room Blocks, VIP Toilets, Primary Health Care/ Maternity, Skills Acquisition/ Civic/Community Centres, Pavilion, Boreholes/Hand Pumps, Water Treatment and Sanitation,  Provision of Electrification/Solar Street Lighting, Transformers, etc
D.8 Maintenance of Electrical System, High Tension / Low Tension Network Assembly and Retrofitting of Public Building with Renewable Energy at Headquarters and Field Offices 
D.9 Provision of Engineering Workshop Tools (Mechanical, Electrical, Water and Structural Tools), Generators and others
D.10 Maintenance of Fire Fighting Equipment, Air conditioners and Water/Plumbing System in Headquarters and Selected Field Offices 
D.11 Construction of Internal and External Directional Posts and Display Boards
D.12 Installation / Rehabilitation and Sustenance of Street Light
D.13 Provision of Road Signages and other Road Furniture on Federal Highways - Consultancy
D.14 Relocation of Utilities (Water Lines, Telecommunications, Electrical Installations and Other Facilities) on Road Projects
  CATEGORY ‘E’: GOODS
E.1 Procurement of Poverty Alleviation & Skills Acquisition Starter Packs
E.2 Acquisition of GIS Equipment, Satellite Imageries, Digital Survey and Data Mining Software for Urban Planning and Surveying activities,
E.3 Procurement of Computer Hardware, Accessories, Consumables  and Software/e-Books, Office Furniture/fittings, Generating  SetStationery,   Photographic/Topographic/  Workshop/Material Testing Equipment and Acquisition  of Medical Equipment/Drugs etc
  CATEGORY ‘F’: CONSULTANCY AND OTHER SERVICES
F.1 Engineering Design & Supervision of  Highway  Roads and Bridges Projects Nationwide
F.2 Consulting and  Professional Services:
  * Training and Capacity Building,
  * ICT Related Services:  Website Development/ Deployment, Software Acquisition/ Projects, e-library/ e-Law Library, Electronic Document Management System/Digitalization
  * Insurance and Actuarial Services
  * Mapping, Studies & Report Preparation and Monitoring & Evaluation  Advisory Exercises and Project Management/Advisory Services
  * Sensitization Exercises, Publicity/ Enlightenment Programme/Documentaries Making, 
  * Maintenance of   ICT/Office Equipment, etc.
  * Facility Management:- Security and Cleaning Services
  * Printing of Non- Security Documents  (Manual Reports, Files, Letter Head Papers)  etc.
  * Inventory and Condition Assessment of Public Buildings Nationwide
F.3 Development and Hosting of the Harmonized Interactive Web Portal, Design and Development of Road Access Management Systems (RAMS) and e-Registry Electronic Document Management System (EDMS) for Lands Department
F.4 Design and Development of Road Access Management System (RAMS) Using Geographic Information System (GIS) including Digitization for Online Road Management in the Country
F.5 Consultancy Services for Development and Management of Highways
F.6 Consultancy Service for the Engagement  of Transaction Advisory Services for Private Public Partnership (PPP) Projects 
F.7 Slum Identification & Mapping In Selected Cities Of Abuja (FCT) & Ibadan (Oyo State) 
F.8 Acquisition of Human Resource Management Information System (HRMIS) Data Base Software / Digitization and Expansion of HRM Registry
F.9 Conduct Baseline Studies on Land Governance and Tenure Structure, Realistic Land Values/Compensation, Demand notice preparation, Resonance Survey and Inventorisation of Federal Government Lands
F.10 Perimeter, Topographic, Layout Survey and as-Built Survey of Federal Government Land/properties in Selected States 
F.11 Conversion of Analogue Spatial Data to Digital Format in the Six (6) Geo – Political Zones
F.12 Up-Grading of Cadastral Geographic Information System (CADGIS) Laboratory and Operationalization of Federal Land Data Base System  at Headquarters &Zonal Headquarters
F.13 Preparation of Physical Development,  Resilience Plansand Master Plan, Physical Development Standards, Guideline and Bye Laws Booklet, Regeneration of City Resilience/ Strength, Need Assessment and Slum Identification Reports in Selected States
F.14 Training and Capacity Development in Auto/Cad and AroGIS Applications for Urban and Regional Planning, Capacity Building for Architects, Quantity Surveyors, Builders and Town Planners in Computer Aided Designs and Standardization and Project Management
F.15 Consultancy Anchor ship and Facilitating the Training of Professionals, (Artisan, Craftsmen etc)
F.16 Building Energy Efficiency Code (BEEC) and Guidelines (BEEG)
F.17 Domestication of UN-HABITAT Guidelines, Plans and Human Capacity Development of Core Staff for the Implementation of the New Urban Agenda (NUA) in Nigeria

3.0    ELIGIBILITY REQUIREMENTS

3.1    The Ministry, in compliance with the provisions of the Public Procurement Act, 2007 and the Public Procurement Regulations for Works, Goods and Services, will carry out pre-qualification/shortlisting of companies/consultants that respond to this advertisement based on the following requirements:

 *  Evidence of Certificate of Incorporation issued byCorporate Affairs Commission (CAC) including Forms CAC2 and CAC7;
 *  Evidence of Company’s current Annual returns to CAC for categories A, B & C;
 *  Evidence of Tax Clearance Certificate (TCC) for the last three (3) years (2016, 2017 & 2018) valid till 31st December, 2019.
 *  Evidence of current Pension Compliance Certificate valid till 31st December, 2019;
 *  Evidence of current Industrial Training Fund (ITF) Compliance Certificate valid till 31st December, 2019;
 *  Evidence of current Nigeria Social Insurance Trust Fund (NSITF) Compliance Certificate valid till 31st December, 2019;
 *  Evidence of Registration on the BPP’s National Database of Federal Contractors, Consultants and Service Providers by submission of a valid Certificate of Registration or Interim Registration Report (IRR) expiring on 31/01/2020;
 *  Unabridged Company Audited Annual Report for the immediate past three (3) years (2016, 2017 & 2018);
 *  For Joint Venture/Partnership, Memorandum of Understanding (MoU) should be provided (CAC, TCC, Pension Compliance Certificate, ITF Compliance Certificate, NSITF Compliance Certificate, IRR &  Sworn Affidavit are compulsory for each JV partner)
 *  A Sworn Affidavit:
1. disclosing whether or not any officer of the relevant committees of the Federal Ministry of Power, Works and Housing (Works and Housing Sector) or the Bureau of Public Procurement is a former or present Director, shareholder or has any pecuniary interest in the bidder and to confirm that all information presented in its bid are true and correct in all particulars;
2. that no Partner/Director has been convicted in any country for criminal offences related to fraudulent or corrupt practices, or criminal misrepresentation or falsification of facts relating to any matter;
3. that the company does not at the time of this bid have any existing loan or financial liability with a bank, other financial institutions or third party that is classified as doubtful, non-performing, bad or whose repayment portion has been outstanding for the last three months
4. that all the submitted documents are GENUINE AND UP TO DATE;
 *  Evidence of Particulars of Directors;

3.2    Local Content, Safety and Social Responsibility for Categories A to C

i)      Indicate the quantum of verifiable employment to be generated stating projected numbers and specialties for skilled (Professional) and unskilled (Non-professional) Manpower;
ii)    Submit verifiable key Management positions that are Nigerian Nationals and the percentage of the company’s total workforce that will be beneficial to youth employment and community development in Nigeria;
iii)    All bidders should include description of current Health, Safety and Environment (HSE) procedures, plan, manuals and HSE performance statistics over the last 3 years including HSE manuals and accident statistics for the past five (5) years; and
iv)    Submit a plan on how to give first consideration to services provided from within Nigeria, raw materials and manufactured goods of Nigerian origin in line with the requirements of Nigerian Content.
v)     State the proposed social benefits to be accrued to the host communities where projects/services are domiciled

4.0    Specific Requirements for Evaluation
i)    In addition to the requirements stipulated in 3.1 to 3.2. bidders are to fulfil the under listed requirements:

4.1    CATEGORY   A:    Roads& Bridges

Annual Turnover
Bidders must have average annual turnover of ten (10) Billion Naira (as evidenced in the tax clearance certificate) in the last three (3) years (2016, 2017 & 2018);
Bidders’ Experience
Bidder must be a prime contractor on at least two (2) projects of similar nature, magnitude and complexity comparable to the works under consideration within the last five (5) years (copies of letters of award/certificates of completion to be attached);
Plant and Equipment
Verifiable evidence that the Bidders have the requisite plants and equipment to execute project of the nature and complexity including Asphalt and Quarry Plants in the Geopolitical Zone of the project biddedfor.
Financial Capacity
Evidence of access to or availability of credit facilities, confirmed by a reputable bank, equivalent of one (1) billion Naira net of other contractual commitments of the successful bidder shall be required;
Manpower
Company profiles with CVs of key professionals including photocopies of relevant academic and professional qualifications with attestation of availability and contact phone numbers (evidence of registration with relevant regulatory professional bodies e.g. COREN, ARCON, CORBON, QSRBN);
Evidence of Firm’s registration with relevant professional body such as: COREN/QSRBN/ARCON/CORBON/SURCON etc.
Maximum Number of Lots
Bidders must restrict their submission of bids to a maximum of one (1) lot, in this category, located in a Geopolitical Zone where they are already mobilized, and which they have comparative advantage in terms of logistics and community social relations.

4.2    CATEGORY B: Roads &Bridges

Annual Turnover
Average Annual Turnover of Two Billion, Five Hundred Thousand Naira (₦2,500,000,000.00) (as evidencedin tax clearance certificate) in the last three (3) years (2016, 2017 & 2018);
Bidders’ Experience
Experience as a prime contractor on at least two (2) projects of similar nature and complexity comparable to the works under consideration within the last five (5) years (copies of letters of award/certificates of completion to be attached);
Plant and Equipment
Evidence that the Bidders have the requisite plants and equipment to execute project of this nature and complexity;
Financial Capacity
Evidence of access to or availability of credit facilities, certified by a reputable Banker, equivalent of Five Hundred Million Naira (₦500,000,000.00) net of other contractual commitments of the successful bidder shall be required;
Manpower
Company profiles with CVs of key professionals including photocopies of relevant academic and professional qualifications with attestation of availability and contact phone numbers (evidence of registration with relevant regulatory professional bodies e.g. COREN, ARCON, CORBON, QSRBN, SURCON);
This is exclusive to Nigerian firms
Maximum number of Lots
Bidders must restrict their submission of bids to a maximum of one (1) lot located in a geopolitical zone where they are already mobilized.

4.3    CATEGORY   C: Roads and Bridges

a)    Annual Turnover
Average Annual Turnover of Five Hundred Million Naira (₦500,000,000.00) (as evidenced in tax clearance certificate) in the last three (3) years (2016, 2017 & 2018);
b)    Bidders’ Experience
Experience as a prime contractor on at least two (2) projects of similar nature and complexity comparable to the works under consideration within the last five (5) years (copies of letters of award/certificates of completion to be attached);
c)    Plant and Equipment
Evidence that the Bidders have the requisite plants and equipment to execute project of this nature and complexity;
d)    Financial Capacity
Evidence of access to or availability of credit facilities, certified by a reputable Banker, equivalent of Fifty Million Naira (₦50,000,000.00) net of other contractual commitments of the successful bidder shall be required;
e)    Manpower
Company profiles with CVs of key professionals including photocopies of relevant academic and professional qualifications with attestation of availability and contact phone numbers (evidence of registration with relevant regulatory professional bodies e.g. COREN, ARCON, CORBON, QSRBN;
f)    This is exclusive to Nigerian firms
g)   Maximum number of Lots Bidders must restrict their submission of bids to a maximum of one (1) lot in each Category

4.4    TECHNICAL REQUIREMENTS FOR BRIDGES:

In addition to the requirements in 4.3, applicants must be Specialist in Bridge Construction/Rehabilitation and shall have the following Minimum Criteria:

Evidence of Experience related to the Project’s Scope of Works which must be described in detail, namely Changing of Expansion Joints, Concrete Strengthening, Changing of Pot Bearings, Post Tensioning Works, Concrete Skin Repair, Pavement Rehabilitation, Corrosion Protection Measures, etc.
Submit Method Statements and Provide Repair Techniques related to Concrete Repair Works which must comply with all of the necessary technical requirements and must be properly coordinated with other refurbishment works of the Bridge.
Applicants must have been engaged in active business as a Concrete Repair Works and Bridge Rehabilitation Contractor for a minimum of two Jobs under the name of the firm applying for prequalification, and must provide Award Letters as evidence.
Applicants must provide all information pertaining to the Experience of the Firm and to its Specialist Engineers in similar type of Works (Provide CVs).
Evidence of having access to Specialized Bridge Repair Material and Bridge Components’ Manufacturers and Suppliers.
Capability for batching, controlling, placing finishing and curing concrete with Specialized Materials for the Resurfacing of the Burnt Section of the Bridge Deck.
Evidence of having a Local Experience in the same type of Works within the last few years is an Advantage.

CATEGORIES D, E and F: other Works, Goods and Services

Bidders’ Experience
Evidence of previous similar jobs with two (2) letters of awards in the last three (3) years (2015, 2016 & 2017);
Plant and Equipment/Warehouse
Verifiable evidence of proof of ownership and/or lease of the construction equipment/Warehouse required for the successful execution of these contracts especially categories D & E;
Financial Capacity
Evidence of financial capability by submission of letter of reference from a reputable Commercial Bank in Nigeria, indicating commitment to fund the project when awarded;
Firm Registration with Professional Bodies
Evidence of Firm’s registration with relevant professional body e.g. NAICOM/Insurance, EHORECON/Cleaning Service, NITDA/CPN/Information Technology, COREN/QSRBN/ARCON/CORBON/SURCON/Construction, NSCDC/Security, ESVARBON/Estate Surveying etc.
Manpower
Key personnel with evidence of registration with Professional bodies likeCOREN, QSRBN, ARCON, SURCON, CORBON, TOPREC, NIESV, CIPSMNetc;
Note that indigenous companies have an advantage in these categories;

5.0    ENQUIRIES

All enquiries are to be directed to:
        The Director,
        Public Procurement Department,
        Federal Ministry of Power, Works and Housing
        Works and Housing Headquarters,
        Mabushi, Abuja.

6.0    METHOD OF SUBMISSION

i)    Bids must be prepared in English Language and signed by the official authorized by the bidder.
ii)    Two copies of Technical documents/Expression of Interest (EoI) for all categories must be submitted on or before 12:00 noon on Monday, 2ndSeptember, 2019. Late submissions will be returned un-opened.
iii)    Bids for categories A, B & C are to be submitted at the Procurement Department Room 105, Block A, 1st Floor, Works Sector FMPW&H Mabushi, Abuja.
iv)    Bids for categories D, E and F are to be submitted at the Conference Room, 3rdFloor, Housing Block, FMPW&H, Mabushi, Abuja.

7.0    OPENING OF EOI/BIDS

i.    EOI/TechnicalBid Documents will be opened immediately after the deadline for submission at 12:00 noon on Monday, 2nd September, 2019,  at the venue stated in 6(iii) and (iv) above.
ONLY technically shortlisted bidders will be invited for collection of Financial bids and Request for Proposals;
Companies or their representatives, Civil Societies, NGOs, Professional Bodies and members of the public are by this notice, invited to witness the bids opening exercise.

8.0    ADDITIONAL INFORMATION

Subject to the Provisions of the Public Procurement Act, 2007 note that:

the Ministry may verify any or all the claims made by applicants and shall disqualify any company whose claims are found to be false in addition to other sanctions that may be deemed necessary;
bidders who have worked for the Ministry and have history of poor performance, abandonment, termination and/or prolonged contract execution period need not apply as their bids may be excluded from the process in line with Section 16(8)(b) of the PPA, 2007;
the Ministry reserves the right to reject any and/or all prequalified Bidders at its sole discretion and at no costs whatsoever in line with Section 28 of the PPA, 2007;
all costs incurred in responding to this advert and prequalifying for the projects shall be borne solely by the Bidders;
for bidders of the projects in the Niger Delta Area and the North Eastern Geopolitical Zone, it is required that they present a formal undertaking that they are capable of working in the area.
none compliance to any of the above instructions will lead to disqualification; and
this advertisement shall not be construed as a commitment on the part of the Ministry to award contract to any bidder.
All documents for submission must be transmitted with a Covering/Forwarding letter under the Company/Firm’s Letter Head Paper bearing amongst others, the Registration Number (RC)  as issued by the Corporate Affairs Commission (CAC), Contact Address, Telephone Number (preferably GSM No.), and e-mail address. The Letterhead Paper must bear the Names and Nationalities of the Directors of the Company at the bottom of the page, duly signed by the authorised officer of the firm.

Signed
Mohammed Bukar
Permanent Secretary
Federal Ministry of Power, Works & Housing
(Works & Housing Sector)

OTHER NEWS
April 12, 2017

FG Commends Progress Of Work On National Housing Project

Federal Government has commenced the construction of houses across the country under the National Housing Programme. The construction works in the Phase 1 of the project tagged “2016 National Housing Programme” are at various stages of completion in the six (6) states of the North Central Zone of the country.

The Minister of state works, Power and Housing, Alhaji Mustapha Baba Shehu disclosed this on Sunday 09/04/2017 during the inspection of the project in Lokoja, Kogi State. Alhaji Baba, who was on inspection tour of the projects in the six states of the North Central came to Lokoja, from Ilorin, Kwara State where he had earlier carried out similar inspection of the project.

The Minister stated that the programme which is meant to provide houses for the people and ease their accommodation problem was a fulfillment of part of the electioneering promises to the people of Nigeria by the All Progressive Congress (APC).

According to him, the programme, apart from making houses readily available and affordable for any interested members of the public, would also help to create job opportunities as different categories of people are engaged to work at the construction site of the project to earn a living.

The Minister said the initiation of the programme by the present administration was a deliberate effort to create wealth for people adding that more Nigerians stand to benefit from the 2nd Phase of the programme in 2017.

While fielding questions from journalists, the Minister expressed satisfaction at the quality of job that has been done and advised the contractors to keep it up in order to complete the work on schedule. The  Federal Controller of Works, Kogi State, Architect Hajara Enesi conducted the Minister round the 76 units of the houses which according to her is made up of 24 blocks of 3 bedrooms flats, 48 blocks of 2 bedroom flats and 4 blocks of 1 bedroom flats.

The controller also disclosed that a total of 12 contractors had been engaged to handle the project in the state. She stated that the estate, when completed, would be provided with social amenities like the police post, primary school and water supply.

The Architect averred that the project, which is schedule to be completed within 5 months, is expected to be handed over to the government in the next 2 months. Some of the contractors, who spoke to the minister commended the Federal Government for initiating the programme, in which they had been engaged to eke out a living.

They however said one of the problems being faced by them on the jobs is the lack of office accommodation and the need to review the cost of the project in view of escalating prices in the market. They appealed to the government to do something about these challenges quickly to enhance quality performance.

The Minister who was accompanied on the tour by some management staff of the ministry has since left the state in continuation of the tour to Nasarawa, Benue and plateau states respectively.

Records 24 to 24 of 25
SPEECHES
July 23, 2019

Remarks By H.E President Muhammadu Buhari At The Meeting With Mr Joe Kaeser, Ceo/President Siemens AG At The State House On Monday 22nd July 2019

1. Thank you all for coming today and for the roles you have all played in planning what we hope will be a significant project to dramatically improve the quality of our electricity supply.

2. I recall my meeting in late August, last year, with Chancellor Merkel here in Abuja, when both our Governments committed to future cooperation to support economic growth and development in Nigeria. We were clear that fixing the power sector was a key priority for this administration.

3. It was during that event that Mr Joe Kaeser, CEO of Siemens AG committed to working with Nigeria to develop a feasible roadmap to modernise our electricity grid with support from the German Government.

4. We all know how critical electricity is to the development of any community or indeed any nation. And in Nigeria, whilst we are blessed to have significant natural gas, hydro and solar resources for power generation, we are still on the journey to achieving reliable, affordable and quality electricity supply necessary for economic growth, industrialization and poverty alleviation.

5. Ladies and Gentlemen, there have been many attempts at solving the electricity problem in our country. Previous Governments have explored State funded solutions through the ill prepared National Independent Power Projects. They also explored the installation of large emergency power projects. There was also the partial privatization of the power generation and distribution sectors.

6. These various interventions to solving the electricity problem have yielded an imbalance between the amount of power generated and the amount available for consumers. Despite over 13,000 megawatts of power generation capacity, only an average of 4,000 megawatts reliably reaches consumers.

7. Now, we have an excellent opportunity to address this challenge.

8. This Government’s priority was to stabilise the power generation and gas supply sector through the Payment Assurance Facility, which led to a peak power supply of 5,222 MW. Nonetheless, the constraints remained at the transmission and distribution systems.

9. This is why I directed my team to ask Siemens and our Nigerian stakeholders to first focus on fixing the transmission and distribution infrastructure – especially around economic centres where jobs are created.

10. Whilst it was evident that more needed to be done to upgrade the sub-transmission and distribution system, our Government was initially reluctant to intervene as the distribution sector is already privatised.

11. I am therefore very pleased with the positive feedback from private sector owners of the distribution companies, who have all endorsed Government’s intervention to engage Siemens on this end-to-end plan to modernise the electricity grid.

12. Our goal is simply to deliver electricity to Nigerian businesses and homes. My challenge to Siemens, our partner investors in the Distribution Companies, the Transmission Company of Nigeria and the Electricity Regulator is to work hard to achieve 7,000 megawatts of reliable power supply by 2021 and 11,000 megawatts by 2023 – in phases 1 and 2 respectively.

13. After these transmission and distribution system bottlenecks have been fixed, we will seek – in the third and final phase – to drive generation capacity and overall grid capacity to 25,000 megawatts.

14. With our strong commitment to the development of Mambilla Hydroelectric and the various solar projects under development across the country, the long-term power generation capacity will ensure adequate energy mix and sustainability in the appropriate balance between urban and rural electrification.

15. Our intention is to ensure that our cooperation is structured under a Government-to-Government framework. No middlemen will be involved, so that we can achieve value for money for Nigerians. We also insist that all products be manufactured to high quality German and European standards and competitively priced.

16. This project will not be the solution to ALL our problems in the power sector. However, I am confident that it has the potential to address a significant amount of the challenges we have faced for decades.

17. Ladies and Gentlemen, it is our hope that as the power situation improves, we will improve investor confidence, create jobs, reduce the cost of doing business and encourage more economic growth in Nigeria.

18. I thank you for coming today, particularly those of you who have had to come from outside Nigeria. I wish you all safe stay in Abuja and safe journeys back home.

19. God bless the Federal Republic of Nigeria.

Records 1 to 1 of 40
Photo News
August 21, 2019

FASHOLA SWORN IN AS MINISTER OF WORKS HOUSING RESUMES AT MINISTRY

President Muhammadu Buhari left congratulating Mr Babatunde Raji Fashola SAN right after the latter took the oath of office as the Minister of Works Housing at the Presidential Villa in Abuja on Wednesday 21st August 2019

Click To View More Pictures

Power News
Photo News
August 21, 2019

FASHOLA AND MINISTER OF STATE ASSUM OFFICE

The Honourable Minister of Works and Housing Hon Babatunde Fashola SAN and the Minister of State Abubakar D Aliyu resumes office at the Ministry s Headquarter Mabushi Abuja with the Permanent Secretary and staff of the Ministry in attendance on the 21st of August 2019

Click To View More Pictures